The overhead linkway is supposed to shield us from the rain during the wet days. But the new overhead linkway installed at Blk 672, Woodlands Drive 71 had already start to leak. On closer look, there is a gap on the roof already.
The material selected for this linkway is not desirable and had already start to corrode less than 1 year into operation. I also wonder whether they have Engineers or maintenance team doing site walk to identify facility issue.
Town Council Fees is going to raise in June 2017 and it must worth every cents we pay for conservancy charges.
It is my duty as a resident to inform the Sembawang Town Council so that they are aware of the quality of the facility installation done.